Eng_Card_Site
Eng_Contacts
Eng_Home
Eng_Home
Eng_About
Eng_Awards
Eng_Predl
Eng_DekoSV10
Eng_DekoSV200
Eng_LS1.2
Eng_LS_MR
Eng_Deko_BA_BO
Eng_Deko_SiO
Eng_St_Moyki
Eng_SBOSV
Eng_KNS
KNS-N
Eng_PU_1
Eng_PU_2
Eng_Gallery
Eng_Card_Site
Eng_Contacts
KNS
KNS


Sitemap  |  Contact details  |  Questionnaires  |   © 1992-2021 "ДЕКО"

Sewerage pump station "ДЕКО-КНС"

(underground version)

ТУ 4859-024-10442696-2009

    Sewerage pump station "ДЕКО-КНС" is used for storage and transmission of water.

          

Spesification

Parameters

Point of measure

Value

1.

Capacity

m3/hour

5-50

2.

Head

m H2O

Up to 40

3.

Diameter (nominal) Dу of the divided inlet manifold

mm

150

4.

Diameter (nominal) Dу of the export header

mm

100

5.

Volume of the receiving tank

m3

9

6.

Category of a premise according to НПБ 105-95

 

Д

7.

Overall dimension of the basic (supporting) foundation basis

m.

3m. х 3m.


Schematic flow diagram

  

Explication

 1.      Building

 2.      Gallery

 3.      Gallery

 4.      Reception tank

 5.      Iintermediate technical compartment

 6.      Working module

 7.      Inlet branch

 8.      Outlet branch

 9.      Plenum ventilation

10.     Mechanical exhaust ventilation

11.     Natural ventilation

12.     Pumps

13.     Level sensor

14.     Discharge basket

15.     Electric hoist

16.     Pipeline valve

17.     Water gate

18.     Nonreturn stop valve

19.     Pipeline valve

20.     Metering station

21.     Three-way cock

22.     Diaphragm seal

23.     Air heater

24.     Air heater

25.     Hot-air curtain

26.     Fan

27.     Slide valve

28.     Container

29.     Valve

30.     Valve

31.     Air heater V=20 l.

32.     Washer with flushing valve

         Work of sewerage pump stations is carried out as follows:

         Sewages through an inlet branch 7 and a discharge basket 14 flows into the reception tank 4, thus, all dust available in sewages remains in a discharge basket 14. At achievement by sewages of the top operating level in the reception tank 4, on a signal of the upper level sensor 13 it is switched on the pump 12 which feeds sewages to a pressure network through a pressure head branch pipe and armature 18,19. At downturn of sewage level in the reception tank 4 up to the bottom mark, the pump 12 is switched off on a signal of the bottom level sensor 13. Adjustment of the delivery volume of sewages in system is carried out by opening-closing of a pipeline valve 19 on a roiling collector.

         At filling of a discharge basket 14 the level of sewages in a inlet branch 7 will raise, that becomes the reason of sensor triggering which will submit on a control panel and the alarm board the signal about necessity of unloading of dust from a discharge basket 14.

         At a raising by electric hoist 15 the discharge baskets 14 (in the beginning of its movement) in the top working module 6 for unloading in the container 28, a water gate 17 is automatically blocked with a inlet branch 7. At returning of a discharge basket 14 on a place the water gate 17 automatically opens inlet branch 7.

         For a possibility of performance of preventive or repair work on an inlet branch 7 it is stipulated the pipeline valve 16.

         As the sewerage pump station operates in an automatic mode without the presence of duty operator, so the presence of a discharge basket 14, sensor and the remote panel provides timely signal injection about a necessity of unloading of dust from a basket 14. It as much as possible prevents the ingress of contamination into the reception tank 4 during overflow of a basket 14.            

         The presence of shutter 17 prevents ingress of contamination into the reception tank 4 during the moment of its unloading from a basket 14.

Ordering model designation (example):


Designation when order (example):

Sewerage pump station for storm waste water "ДЕКО-КНС-4,0/25 (-3,5/+1,2)"

ТУ 4859-024-10442696-2009,  

где:      4,0 –  Capacity (m3/hour);

            25  –  Head (m H2O);

          -3,5  –  Mark of supply pipeline connection;

         +1,2  –  Mark of lateral pipeline connection.

Shipment ДЕКО-КНС by motor transport

Shipment ДЕКО-КНС by motor transport (oversize)

Station "ДЕКО-КНС" (inside view). Control Assembly.

Certificate of conformance

Теl./fax:  (4832) 56-59-38

(4832) 52-19-33

(4832) 57-76-04

Company "ДЕКО", Brjansk

Wastewater treatment 

and gas emissions

  

- Eng

- Rus

dekoform@mail.ru

deko@dekoform.su