Eng_Card_Site
Eng_Contacts
Eng_Home
Eng_Home
Eng_About
Eng_Awards
Eng_Predl
Eng_DekoSV10
Eng_DekoSV200
Eng_LS1.2
Eng_LS_MR
Eng_Deko_BA_BO
Eng_Deko_SiO
Eng_St_Moyki
Eng_SBOSV
Eng_KNS
KNS-N
Eng_PU_1
Eng_PU_2
Eng_Gallery
Eng_Card_Site
Eng_Contacts
KNS-N
KNS-N


Sitemap  |  Contact details  |  Questionnaires  |   © 1992-2021 "ДЕКО"

   Sewerage pump station ДЕКО-КНС is used for storage and transmission of water.

          

Spesification

Parameters

Point of measure

Value

1.

Capacity

m3/hour

25

2.

Head

m H2O

Up to 50

3.

Diameter (nominal) Dу of the divided inlet manifold

mm

80

4.

Diameter (nominal) Dу of the export header

mm

80

5.

Category of a premise according to НПБ 105-95

 

Д

6.

Overall dimension of the basic (supporting) foundation basis


m.


6,6m. х 2,5m.


Schematic flow diagram

  

                                                            Explication

1.

Building;

12.

Primary block pumps;

2.

Ground;

13.

Secondary block pumps;

3.

Tank receiving;

14.

Level sensor;

4.

Tank accumulative;

15.

Level sensor;

5.

Technical compartment;

16.

Valve;

6.

Supply sewage (Dу80);

17.

Valve;

7.

Drainage (Dу80);

18.

Valve;

8.

Ventilation inlet;

19.

Back valve;

9.

Ventilation;

20.

Water gauge site;

10.

Ventilation exhaust forced;

21.

Air heater;

11.

Fan;

22.

Basket reception.

  

         The work of the sewage pumping stations is carried out as follows.

         Waste water through the pipe 6 and selection (mesh) basket 22 arrive in the receiving tank 3 all available in wastewater waste remains in the receiving basket 22. When reaching the wastewater working level in the suction tank 32 on a signal of the upper level sensor 13 pump 12 which feeds the waste water in the tank rollup 4. At the operation level of the sewage in a reservoir cumulative 4 pump 13 is triggered by a sensor 15. Adjusting the volume of supply of the waste water system is done with opening-closing of the valve 18.

         When filling mesh baskets 14 garbage level of wastewater in the socket 6 begins to riseо causing the sensorт which will control panel and remote signal signal about the need to unload garbage from the selection of the basket.

To be able to perform maintenance or repair of pipe 6 you latch 16.

         


Ordering model designation (example):


Designation when order (example):

Sewerage pump station for storm waste water ДЕКО-КНС(Н)-25/55 (+0,9/+3,2)

ТУ 4859-024-10442696-2009,  

где:      25   –  Capacity (m3/hour);

            55   –  Head (m H2O);

          +0,9  –  Mark of supply pipeline connection;

          +3,2  –  Mark of lateral pipeline connection.


Questionnaires

Sewerage pump station ДЕКО-КНС

(ground version)

ТУ 4859-024-10442696-2009

Certificate of conformance

Теl./fax:  (4832) 56-59-38

(4832) 52-19-33

(4832) 57-76-04

Company "ДЕКО", Brjansk

Wastewater treatment 

and gas emissions

  

- Eng

- Rus

dekoform@mail.ru

deko@dekoform.su